CONTRACTOR-RELATED VARIATIONS AND IMPLEMENTATION OF KENYA NATIONAL HIGHWAYS AUTHORITY PROJECTS

Authors

  • Francis Benedict Ondiek Jomo Kenyatta University of Agriculture and Technology, Kenya
  • Antony Sije Jomo Kenyatta University of Agriculture and Technology, Kenya
  • Yusuf Muchelule Jomo Kenyatta University of Agriculture and Technology, Kenya

Keywords:

Contractor-related variations, implementation, Kenya National Highways Authority projects

Abstract

Contractor-related variations are a major source of inefficiency in road infrastructure projects, often resulting in delays, cost overruns, and disputes. This study investigated how contractor-related variations affect the implementation of Kenya National Highways Authority (KeNHA) road projects and examined the moderating effect of risk management on this relationship. Drawing on Agency Theory and Stakeholder Theory, the study adopted a descriptive research design involving 50 ongoing KeNHA road projects. The study identified a census target population of 600 respondents and obtained 443 valid responses, for a response rate of 73.8%. The study collected data using structured questionnaires and analyzed them using descriptive statistics, regression analysis, and moderation testing. The findings revealed that poor prioritization of work programs (M = 4.678, SD = 0.568), inaccurate estimation of project duration (M = 4.268, SD = 0.710), lack of specialized project managers (M = 4.084, SD = 0.807), and inadequate equipment mobilization (M = 4.045, SD = 0.738) were among the major contractor-related variations contributing to project delays and cost escalations. Regression results showed that contractor-related variations significantly affected project implementation and explained 61.2% of the variance in project implementation outcomes (R² = 0.612, F = 694.248, p < 0.001). Further analysis revealed that risk management significantly moderates the relationship between contractor-related variations and project implementation (β = 0.010, p < 0.001), indicating that effective risk management practices mitigate the adverse effects of contractor-related variations and enhance project implementation outcomes. The study concludes that contractor-related variations pose significant risks to the successful implementation of road infrastructure projects when not effectively managed. The study recommends strengthening risk management practices, enhancing contractor accountability, and improving project planning and resource mobilization to enhance project implementation outcomes in Kenya.

References

African Export–Import Bank. (2023). Contracting engineering, procurement, and construction projects in Africa: Survey report. Cairo, Egypt: Afreximbank.

Chalchissa, H. (2021). Variation order and its effect on construction project performance: In the case of road construction projects in Addis Ababa (Doctoral dissertation, St. Mary’s University).

Donaldson, T., & Preston, L. E. (1995). The stakeholder theory of the corporation: Concepts, evidence, and implications. Academy of Management Review, 20(1), 65–91.

Eisenhardt, K. M. (1989). Agency theory: An assessment and review. Academy of Management Review, 14(1), 57–74.

Elshaboury, N., Mohamed, Y., & Elsaid, A. (2020). Overall ranking of the most influential causes and impacts of variation orders in Arab construction projects. In 2nd International Conference on Applied Economics and Social Science.

Freeman, R. E. (1984). Strategic management: A stakeholder approach. Pitman Publishing.

Gatitu, J. N., Kabubo, C. K., & Ajwang, P. (2020). Approaches on mitigating variation orders in road construction industry in Kenya: The case of Kenya National Highways Authority (KeNHA). Engineering, Technology & Applied Science Research, 10(5), 6195–6199.

Jensen, M. C., & Meckling, W. H. (1976). Theory of the firm: Managerial behavior, agency costs, and ownership structure. Journal of Financial Economics, 3(4), 305–360.

Koirala, M. P., Thapa, N., Giri, O. P., & Shah, R. K. (2025). Evaluation of Variation Orders on road construction project in rural Nepal. Construction Economics and Building, 25(4), 311-338.

Lagat, R. K. E. (2025). Effect of supplier risk profiling on continuity of road construction projects at Kenya National Highways Authority (KeNHA). International Journal of Social Sciences Management and Entrepreneurship (IJSSME), 9(3).

Moore, M. A., & Vining, A. R. (2023). PPP performance evaluation: The social welfare goal, principal–agent theory and political economy. Policy Sciences, 56(2), 267–299.

Okoye, P., & Chukwu, J. (2021). Causes and effects of variation orders in Nigerian construction projects. International Journal of Construction Management, 21(5), 389–398.

Randa, A., Chen, C., Wu, C., & Lu, S. (2021). Variation orders in Asian construction projects: A comparative study. Journal of Civil Engineering and Management, 27(4), 312–322.

RICS. (2023). Change control and management (1st ed.). London: Royal Institution of Chartered Surveyors.

Saki, R., & Yeom, C. (2022). Causes of variation orders in road construction projects in Tanzania. The Open Transportation Journal, 16(1), 1–12.

Shugran, A. A., & Ghazali, F. M. (2025). Understanding the effects of variation orders on construction project success: insights from the Jordanian context. International Journal of Construction Management, 25(5), 519-529.

Tipu, W. A., & Yousaf, T. (2022). Agency theory in public-private partnership projects: A review. International Journal of Public Sector Management, 35(7), 801–819.

Wambugu, S., & Muturi, W. (2022). Influence of variation orders on performance of road construction projects in Kenya. International Journal of Project Management, 40(2), 145–156.

World Bank. (2021). Kenya Country Partnership Framework 2021–2025. Washington, DC: World Bank.

Yusuff, O., & Adebayo, T. (2024). Post COVID challenges in African infrastructure projects: Variation orders and contractual disputes. Journal of Construction Engineering and Management, 150(3), 04024012.

Downloads

Published

2026-10-02

How to Cite

Ondiek , F. B., Sije, A., & Muchelule , Y. (2026). CONTRACTOR-RELATED VARIATIONS AND IMPLEMENTATION OF KENYA NATIONAL HIGHWAYS AUTHORITY PROJECTS . Scholar Africa Journal of Innovation, 2(2), 1–14. Retrieved from https://sajijournal.org/publication/index.php/SAJI/article/view/18